1861. In PERT analysis, the time estimates of activities and probability of their occurrence follow_______________?
comments icon0

A. none of the above

B. Poissons distribution curve

C. Beta distribution curve

D. normal distribution curve

1862. Switch angle depends on______________?
comments icon0
A. heel divergence

B. correct answer is?

C. length of tongue rail

D. throw of switch</strong>

E. ) flangeway clearance

1865. Select the correct statement?
comments icon0
A. A meander increases the river length but a cut off reduces the river length

B. A cutoff increases the river length but a meander reduces the river length

C. Both meander and cutoff increase the river length

D. Both meander and cutoff decrease the river length

1867. The maximum bending moment due to a train of wheel loads on a simply supported girder_________________?
comments icon0

A. never occurs under a wheel load

B. always occurs under a wheel load

C. none of the above

D. always occurs at centre of span

1870. Critical path_____________?
comments icon0

A. may be shortest

B. may be longest

C. is always shortest

D. is always longest
1872. Slack time refers to_______________?
comments icon0

A. an activity

B. an event

C. both event and activity

D. none of the above

1876. Select the incorrect statement?
comments icon0

A. Latest finish of an activity is the late event time of the node it enters.

B. Latest start of an activity is its latest finish minus its duration.

C. Earliest start of an activity is the early event time of the node it leaves.

D. none of the above
1878. Earliest finish of an activity is always_______________?
comments icon0

A. greater than or equal to earliest event time of the following node

B. greater than earliest event time of the following node

C. less than or equal to earliest event time of the following node

D. less than earliest event time of the following node

1879. The constraints in case of resource smoothening operation would be_______________?
comments icon0

A. resources

B. project duration time

C. both resources and project duration time

D. none of the above

1880. The Castiglianos second theorem can be used to compute deflections________________?
comments icon0

A. at the point under the load only

B. in statically determinate structures only

C. for beams and frames only

D. for any type of structure