1. The reduction in project time normally results in_______________?
comments icon0

A. increasing the direct cost and indirect cost both

B. decreasing the direct cost and indirect cost both

C. increasing the direct cost and decreasing the indirect cost

D. decreasing the direct cost and increasing indirect cost

3. In resources levelling________________?
comments icon0

A. cost of project is controlled

B. total duration of project is increased

C. total duration of project is reduced

D. uniform demand of resources is achieved
4. Grader is used mainly for___________________?
comments icon0
A. finishing, shaping and trimming

B. shaping and trimming

C. finishing and shaping

D. trimming and finishing

6. The area under the Beta distribution curve is divided into two equal parts by_______________?
comments icon0

A. most likely time

B. optimistic time

C. expected time

D. pessimistic time

9. Sensitivity analysis is a study of__________________?
comments icon0

A. comparison of assets and liabilities

B. change in output due to change in input

C. economics of cost and benefits of the project

D. comparison of profit and loss

13. Updating may result in_________________?
comments icon0

A. change of critical path

B. increase of project completion time

C. decrease of project completion time

D. all of the above
17. Latest start of an activity is always________________?
comments icon0

A. less than or equal to latest event time of preceding node

B. greater than or equal to latest event time of preceding node

C. less than latest event time of preceding node

D. equal to latest event time of preceding node

20. The time corresponding to minimum total project cost is_______________?
comments icon0

A. crash time

B. optimistic time

C. between normal time and crash time

D. normal time