1881. Which one of the following tunnelling methods is used for laying under ground sewers ?
comments icon0

A. Italian method

B. German method

C. Army method

D. Needle beam method

1885. Independent displacement components at each joint of a rigid-jointed plane frame are_________________?
comments icon0

A. three rotations

B. one linear movement and two rotations

C. two linear movements and one rotation

D. three linear movements

1886. Select the incorrect statement?
comments icon0

A. Critical activities control the project duration

B. Critical activity is the one for which free float is zero

C. A critical path always begins at the very first event

D. A critical path always terminates at the last event

1887. Pick up the correct statement from the following?
comments icon0
A. All the above

B. The diameter of a rivet, before driving is taken as the nominal diameter of the rivet

C. For rivets of nominal diameters less than 25 mm, the diameter of the rivet hole is taken as the nominal diameter of the rivet plus 1.5 mm

D. The diameter of the rivet hole is taken as the gross area of the rivet

1889. The engine failure case for determining the basic runway length may require________________?
comments icon0

A. only clearway

B. either a clearway or a stopway

C. either a clearway or a stopway or both

D. only stop way ,

1891. Flangeway clearance is the distance_________________?
comments icon0

A. none of the above

B. between the gauge faces of the stock rail and the tongue rail

C. between the adjoining faces of the running rail and the check rail near the crossing

D. through which the tongue rail moves laterally at the toe of the switch

1894. The correct sequence of these activities is________________?
comments icon0

A. sider the following activities in a building construction?

1895. The correct sequence of drilling equipment for increasing size of holes in tunnels is________________?
comments icon0

A. churn drill, wagon drill, shot drill

B. wagon drill, shot drill, churn drill

C. wagon drill, churn drill, shot drill

D. shot drill, churn drill, wagon drill

1896. PERT technique of network analysis is mainly useful for__________________?
comments icon0

A. deterministic activities

B. research and development projects

C. small projects

D. large and complex projects

1899. Which of the following methods of structural analysis is a displacement method ?
comments icon0

A. three moment equation

B. none of the above

C. moment distribution method

D. column analogy method

1900. In compressed air tunneling, the volume of free air provided is______________?
comments icon0

A. 6 m3 per hour per m2 of face area

B. 6 mJ per second per m2 of face area

C. 20 m3 per minute per m2 of face area

D. 6 m3 per minute per m2 of face area