221. A graphical technique for finding if changes and variation in metrics data are meaningful is known as_________________?
comments icon0

A. All of the mentioned

B. DRE (Defect Removal Efficiency)

C. Control Chart

D. Function points analysis

222. In what type of coupling, the complete data structure is passed from one module to another ?
comments icon0

A. Control Coupling

B. External Coupling

C. Content Coupling

D. Stamp Coupling
223. Which of the following is a Strategy to achieve Software diversity ?
comments icon0

A. Explicit specification of different algorithms

B. Different design methods and tools

C. All of the mentioned

D. Different programming languages

225. Degree to which design specifications are followed in manufacturing the product is called_________________?
comments icon0

A. Quality Assurance

B. Quality Control

C. Quality of conformance

D. None of the mentioned

228. Usability in metric analysis is defined as the degree to which the software_________________?
comments icon0

A. makes optimal use of system resources

B. none of the mentioned

C. is easy to use

D. stated needs

229. Statement and branch coverage metrics are part of______________________?
comments icon0

A. Analysis Model

B. Design Model

C. Testing

D. Source Code

230. CMM stands for_____________________?
comments icon0

A. Capability Maturity Module

B. Conservative Maturity Model

C. Capability Management Module

D. Capability Maturity Model
231. In Design phase, which is the primary area of concern ?
comments icon0

A. Architecture

B. Data

C. All of the mentioned

D. Interface

233. Which of the following is not an option to achieve reliable cost and effort estimate ?
comments icon0

A. Use one or more empirical models for software cost and effort estimation

B. The ability to translate the size estimate into human effort, calendar time, and dollars

C. Base estimates on similar projects that have already been completed

D. Use relatively simple decomposition techniques to generate project cost and effort estimates

234. According to ISO 9001, the causes of nonconforming product should be____________________?
comments icon0

A. deleted

B. eliminated

C. eliminated and identified

D. identified

235. Which of the following is a function of CASE Tool ?
comments icon0

A. All of the mentioned

B. Maintaining the data dictionary

C. Supporting Structured analysis and design (SA/SD)

D. Checking whether DFDs are balanced or not

236. Which of the following are parameters involved in computing the total cost of a software development project ?
comments icon0

A. Travel and training costs

B. Effort costs

C. Hardware and software costs

D. All of the mentioned
238. What is not included in prevention costs ?
comments icon0

A. formal technical reviews

B. quality planning

C. equipment calibration and maintenance

D. test equipment

240. Which of the following is not categorized under Component-Level Design Metrics ?
comments icon0
A. Morphology Metrics

B. Complexity Metrics

C. Coupling Metrics

D. Cohesion Metrics