waste water engineering MCQs – Page 3

Practise focused waste water engineering questions with marked answers for exam preparation and subject revision.

waste water engineering Mcqs
42. For sewers, inverted siphon is provided for___________________?
comments icon0

A. One pipe

B. Three pipes

C. Two pipes

D. Four pipes

44. The flow velocity in detritus tanks is________________?
comments icon0

A. 0.05 m/sec

B. 0.09 m/sec

C. None of these

D. 1.25 m/sec

47. The sewer pipes__________________?
comments icon0
A. All the above

B. Are designed for generating self-cleansing velocities at different discharge

C. Carry sewage as gravity conduits

D. Should resist the wear and tear caused due to abrasion

49. Removal of oil and grease from sewage, is known____________________?
comments icon0

A. Screening

B. None of these

C. Filtration

D. Skimming
51. In very first stage of decomposition of the organic matter in sewage________________?
comments icon0

A. Nitrites are formed

B. Nitrates are formed

C. Ammonia is formed

D. Carbondioxide is formed

54. Disposal to sewage in large cities, is done in__________________?
comments icon0

A. Purification

B. Dilution

C. Irrigation

D. Oxidation

57. In a sludge tank, the gas mainly produced, is_________________?
comments icon0

A. Oxygen

B. Nitrogen

C. Hydrogen

D. Carbon dioxide
58. The non-clog pump which permits solid matter to pass out with the liquid sewage, is________________?
comments icon0
A. Centrifugal pump

B. None of these

C. Reciprocating pump

D. Pneumatic ejector

59. The algae dies out in the zone of_____________________?
comments icon0
A. Degradation

B. Cleaner water

C. Active decomposition

D. Recovery

60. A manhole is generally provided at each__________________?
comments icon0

A. Change of gradient

B. Junction

C. All the above

D. Bend