The 660kV Matiari-Lahore HVDC Transmission line being built at a cost of $1.6 billion is_________km long.
Found an error? Read our corrections policy and report it in the comments below.
B. 686
C. 986
D. 786
Found an error? Read our corrections policy and report it in the comments below.