In full face method of constructing tunnels, the first operation relates to______________?

A. excavation of one drift in the centre

B. excavation being done along the periphery

C. removal of bottom portion

D. removal of top portion

Found an error? Read our corrections policy and submit a sourced correction below. You can also share a useful explanation in your own words.

Discuss the answer or suggest a sourced correction
Thank you for contributing.
Your comment was submitted and will appear after editorial review.

Your email is used only for moderation and is never displayed. Spam, copied material and fabricated endorsements are rejected.