irrigation water resources engineering and hydrology MCQs – Page 2

Practise focused irrigation water resources engineering and hydrology questions with marked answers for exam preparation and subject revision.

irrigation water resources engineering and hydrology Mcqs
22. A river bend characterized by silting_______________?
comments icon0

A. scouring on concave side

B. scouring on concave side and silting on convex side

C. scouring on convex side and on concave side

D. silting on convex side

23. If there are two canals taking off from each flank of a river, then there will be____________________?
comments icon0

A. two divide walls and one undersluice

B. two divide walls and two undersluices

C. one divide wall and two undersluices

D. one divide wall and one undersluice

24. For supplying water to rabi crop, kharif crop and sugarcane, the channel is designed for a capacity equal to the greater of the water requirement of_______________?
comments icon0

A. rabi or kharif

B. rabi and kharif or sugarcane

C. rabi and sugarcane or kharif and sugarcane

D. rabi or kharif or sugarcane

25. With the increase in the quantity of water supplied, the yield of most crops_________________?
comments icon0
A. increases upto a certain limit and then decreases

B. increases upto a certain limit and then becomes constant

C. decreases continuously

D. increases continuously

26. Unit of runoff in M.K.S. system is________________?
comments icon0

A. square metre

B. cubic metre

C. metre/sec

D. cubic metre/sec
27. In a chute spillway, the flow is usually____________________?
comments icon0

A. uniform

B. super critical

C. critical

D. subcritical

29. A runoff river plant is____________?
comments icon0

A. none of the above

B. a high head scheme

C. a low head scheme

D. a medium head scheme

31. When the reservoir is full, the maximum compressive force in a gravity dam is produced______________?
comments icon0

A. at the heel

B. at the toe

C. at centre of base

D. within the middle third of base

33. The outlet discharge factor is the duty at the head of_________________?
comments icon0
A. watercourse

B. branch canal

C. distributory

D. main canal

34. Infiltration rate is always________________?
comments icon0

A. less than the infiltration capacity

B. equal to or more than the infiltration capacity

C. more than the infiltration capacity

D. equal to or less than the infiltration capacity
35. A hyetograph is a graphical representation of___________________?
comments icon0

A. cumulative rainfall and time

B. discharge and time

C. rainfall intensity and time

D. rainfall depth and time

36. Infiltration capacity_________________?
comments icon0

A. is a constant factor

B. changes with time

C. changes with location

D. changes with both time and location
39. The water utilizable by plants is available in soils mainly in the form of________________?
comments icon0

A. chemical water

B. gravity water

C. capillary water

D. hydroscopic water