5402. In the mid-section formula__________________?
comments icon0

A. The mean depth is the average of depths of two consecutive sections

B. The area of mid-sections is calculated by using mean depth

C. All of the above

D. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections

5404. For the construction of buildings, the subheads of the estimate are________________?
comments icon0

A. Brickwork Flooring, Wood work, Steel work

B. Brickwork, Stone work, Roofing

C. All the above

D. Earthwork, Concrete work, Brick work

5406. Anti-siphonage pipe is connected to__________________?
comments icon0

A. Side of water closet

B. Top of P trap W.C.

C. Bottom of P trap W.C.

D. Main soil pipe

5408. The brick work is not measured in cu m in case of_______________?
comments icon0

A. Reinforced brick work

B. Half brick wall

C. One or more than one brick wall

D. Brick work in arches

5410. Pick up the correct statement from the following?
comments icon0

A. The earthwork calculation in excavation is made from the difference in levels obtained with a level

B. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers

C. In order to check up the average depth of excavation, Dead man s are left at the mid-widths of borrow pits

D. All the above
5411. The correct Prismoidal formula for volume is________________?
comments icon0
A. D/3 [first area + last area + 4 Even area + 2 odd areas]

B. D/3 [first area + last area + 2 Even area + 4 odd areas]

C. D [first area + last area + Even area + 2 odd areas]

D. D/6 [first area + odd areas]

5412. S: 1 and length is______________?
comments icon0
A. L.D 1 + s2)

B. 2 L.D 1 + s 2)

C. d2 ( ds)2]

D. d d s

5413. Pick up the correct statement from the following?
comments icon0

A. The gully trap disconnects the sullage drain from the main drainage system

B. The grating provided over gully traps is 23 cm square

C. The gully trap collects waste water from the kitchen, sink, wash basins, etc.

D. In a gully trap, a water seal of 6 to 7.5 cm is provided

5414. Pick up the incorrect statement from the following?
comments icon0

A. Dimensions are measured to the nearest 0.01 m

B. Cubic contents are measured to the nearest 0.1 cum

C. Areas are measured to the nearest 0.01 sq.m

D. Weights are measured to the nearest 0.001 tonnes

5418. Pick up the correct statement from the following?
comments icon0

A. Detailed specifications specify qualities, quantities and the proportions of materials to be used for a particular item

B. Additional supervising staff engaged at work site, is called work charged establishment

C. The incidental expenses of a miscellaneous character which could not be predicted during preparation of the estimate, is called contingencies

D. All the above