civil engineering MCQs – Page 270

Practise multiple-choice questions from civil engineering for competitive examinations and subject revision. Review each marked answer and report any item that may be outdated or unclear.

civil engineering Mcqs
5382. The following item of earth work is not measured separately ?
comments icon0

A. Steps in deep excavation

B. All the above

C. Setting out of works

D. Site clearance

5383. The rate of an item of work depends on_________________?
comments icon0
A. All the above

B. Specifications of materials

C. Specifications of works

D. Proportion of mortar

5384. The centre line method is specially adopted for estimating_________________?
comments icon0

A. Circular buildings

B. All the above

C. Hexagonal buildings

D. Octagonal buildings

5385. The measurement is made for stone work in square metre in case of________________?
comments icon0

A. Building work

B. Columns, lintels, copings

C. A. and D. of the above

D. Wall facing

5386. While estimating the qualities for the construction of a building, the correct metric unit is________________?
comments icon0

A. Cubic metre for area

B. Metre for length

C. Square metres for volume

D. Litre for capacity
5387. According to Indian Standards Institute, the actual size of modular bricks is_______________?
comments icon0

A. 25 cm 13 cm 7.5 cm

B. 19 cm 9 cm 9 cmD. 20 cm 10 cm 10 cm

C. 23 cm 11.5 cm 7.5 cm

5389. While estimating a reinforced cement structure, the omitted cover of concrete is assumed_______________?
comments icon0

A. In thin slabs, 12 mm minimum or diameter of the bar whichever is more

B. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more

C. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar

D. All the above
5390. The area of the cross-section of a road fully in banking shown in the given figure, is________________?
comments icon0

A. [sb + r (2bd + sd)]/(r s5)

B. [sb + r (2bd + sd)]/(r s)

C. [sb + r (2bd + sd)]/(r s)

D. None of these

5393. The measurement is made in square metre in case of_________________?
comments icon0

A. Hollow concrete block wall

B. R.C.C. structure

C. None of these

D. Cement concrete in foundation

5394. The plinth area of a building not includes_________________?
comments icon0

A. Area of the walls at the floor level

B. Lift and wall including landing

C. Internal shaft for sanitary installations up to 2 sq m. in area

D. Area of cantilevered porch
5395. The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
comments icon0

A. Earth work in excavation

B. All the above

C. Excavation in trenches for foundation

D. Rock cutting

5396. Carpet area does not include the area of_________________?
comments icon0
A. All the above

B. Bath room and lavatory

C. The walls along with doors and other openings

D. Kitchen and pantry

5397. The item of the brick structure measured in sq.m, is___________________?
comments icon0

A. Brick edging

B. Reinforced brick work

C. Broken glass coping

D. Brick work in arches

5398. The assumption on which the trapezoidal formula for volumes is based, is________________?
comments icon0

A. The mid-area of a pyramid is half the average area of the ends

B. The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied

C. The end sections are parallel planes

D. All the above
5400. The cross -sections for a highway is taken at_________________?
comments icon0

A. Right angle to the centre line

B. All the above

C. 30 metres apart

D. Intermediate points having abrupt change in gradient