5255. The centrifugal force due to curvature of track is assumed to act on the bridge at a height of___________________?
comments icon0
A. 1.83 m above the rail level

B. 1.23 m above the rail level

C. 2.13 m above the rail level

D. 1.50 m above the rail level

5257. Load factor is____________________?
comments icon0

A. always equal to factor of safety

B. always less than factor of safety

C. always greater than factor of safety

D. sometimes greater than factor of safety

5259. The forces acting on the web splice of a plate girder are__________________?
comments icon0
A. shear and bending forces

B. shear and axial forces

C. axial forces

D. axial and bending forces

5260. The moment-curvature relation at a plastic hinge is________________?
comments icon0

A. linear

B. parabolic

C. constant moment for all curvatures

D. constant curvature for all moments

5263. Steel tanks are mainly designed for_______________________?
comments icon0

A. earthquake forces

B. wind pressure

C. weight of tank

D. water pressure
5264. For rivets in tension with counter-sunk heads, the tensile value shall be____________________?
comments icon0
A. reduced by 33.3%

B. reduced by 25 %

C. increased by 33.3 %

D. increased by 25 %

5266. Other conditions being same, the load factor in indeterminate structures is_______________?
comments icon0

A. equal to load factor in determinate structures

B. less than the load factor in determinate structures

C. more than the load factor in determinate structures

D. unpredictable

5267. The diameter of base of conical flare of a steel stack is_____________________?
comments icon0

A. equal to d

B. more than d

C. any of the above

D. less than d

5268. The portal bracing in a truss bridge is used to_____________________?
comments icon0
A. transfer load from top of end posts to bearings

B. stiffen the structure laterally

C. keep the rectangular shape of the bridge cross-section

D. prevent the sidesway buckling of top chord

5269. The statical method of plastic analysis satisfies_______________?
comments icon0

A. mechanism and plastic moment conditions

B. equilibrium condition only

C. equilibrium and plastic moment conditions

D. equilibrium and mechanism conditions

5270. The elastic strain for steel is about_________________?
comments icon0
A. 1/12 of strain at the initiation of strain hardening and 1/200 of maximum strain

B. 1/24 of strain at the initiation of strain hardening and about 1/200 of maximum strain

C. 1/12 of strain at the initiation of strain hardening and about 1/120 of maxi-mum strain

D. 1/2 of strain at the initiation of strain hardening and about 1/12 of maxi-mum strain

5273. The capacity of the smallest pressed steel tank is__________________?
comments icon0
A. 1950 litre

B. 1000 litre

C. 1650 litre

D. 2450 litre

5274. Bearing stiffeners are provided at________________?
comments icon0
A. the supports

B. ) the point of application of concentrated loads</strong>

C. the mid span

D. correct answer is?

5275. The reduction in project time normally results in_______________?
comments icon0

A. increasing the direct cost and indirect cost both

B. decreasing the direct cost and indirect cost both

C. increasing the direct cost and decreasing the indirect cost

D. decreasing the direct cost and increasing indirect cost

5277. In resources levelling________________?
comments icon0

A. cost of project is controlled

B. total duration of project is increased

C. total duration of project is reduced

D. uniform demand of resources is achieved
5278. Grader is used mainly for___________________?
comments icon0
A. finishing, shaping and trimming

B. shaping and trimming

C. finishing and shaping

D. trimming and finishing

5280. The area under the Beta distribution curve is divided into two equal parts by_______________?
comments icon0

A. most likely time

B. optimistic time

C. expected time

D. pessimistic time

5283. Sensitivity analysis is a study of__________________?
comments icon0

A. comparison of assets and liabilities

B. change in output due to change in input

C. economics of cost and benefits of the project

D. comparison of profit and loss

5287. Updating may result in_________________?
comments icon0

A. change of critical path

B. increase of project completion time

C. decrease of project completion time

D. all of the above
5291. Latest start of an activity is always________________?
comments icon0

A. less than or equal to latest event time of preceding node

B. greater than or equal to latest event time of preceding node

C. less than latest event time of preceding node

D. equal to latest event time of preceding node

5294. The time corresponding to minimum total project cost is_______________?
comments icon0

A. crash time

B. optimistic time

C. between normal time and crash time

D. normal time

5295. Which of the following is a weakness of bar chart ?
comments icon0
A. all of the above

B. project progress

C. interdependencies of activities

D. uncertainties

5297. Preliminary project report for a road project must contain___________________?
comments icon0

A. the several alternatives of the project that have been considered

B. the contract documents for inviting tenders

C. the detailed estimated cost based on detailed design

D. the soil survey, traffic survey, concept design and approximate cost