2451. The two dimensions of spiral model are ______________________?
comments icon0
A. radial, angular

B. diagonal, angular

C. radial, perpendicular

D. diagonal, perpendicular

2452. Who identifies, documents, and verifies that corrections have been made to the software ?
comments icon0

A. Project manager

B. Project team

C. All of the mentioned

D. SQA group
2453. What does ACT stands for in In Boehm model for software maintenance ?
comments icon0

A. Annual change track

B. Actual change traffic

C. Actual change track

D. Annual change traffic
2455. Processes for evolving a software product depend on __________________?
comments icon0
A. All of the mentioned

B. Development processes used

C. Skills and experience of the people involved

D. Type of software to be maintained

2456. Which one of the following is not a maintenance model ?
comments icon0

A. Iterative enhancement model

B. Quick fix model

C. Waterfall model

D. Reuse-oriented model

2458. In a sociotechnical system, you need to consider reliability from perspectives namely ?
comments icon0

A. only software reliability

B. hardware, software and operator reliability

C. hardware and software reliability

D. only hardware reliability

2459. CSQA stands for __________________?
comments icon0

A. Certified Software Quality Acclaimed

B. Certified Software Quality Analyst

C. None of the mentioned

D. Certified Software Quality Approved

2460. CSTE stands for ____________________?
comments icon0
A. Certified Software Tester

B. Certified Software Technology

C. None of the mentioned

D. Certified Software Trainee

2461. Which of the following is not an appraisal cost in SQA ?
comments icon0
A. quality planning

B. testing

C. inter-process inspection

D. maintenance

2462. Which requirements are the foundation from which quality is measured ?
comments icon0

A. None of the mentioned

B. Programmers

C. Hardware

D. Software
2464. What type of software testing is generally used in Software Maintenance ?
comments icon0
A. Regression Testing

B. System Testing

C. Integration Testing

D. Unit Testing

2466. In CMM, the life cycle activities of requirements analysis, design, code, and test are described in_________________________?
comments icon0
A. Software Product Engineering

B. Software Subcontract Management

C. Software Quality Management

D. Software Quality Assurance

2469. Third Party Certification for software standards is based on ___________________?
comments icon0

A. Ul 1992, Second Edition

B. Ul 1998, Second Edition

C. UT 1998, Second Edition

D. Ul 1996, Second Edition

2470. A sociotechnical system is a system that includes___________________?
comments icon0

A. people

B. hardware

C. software

D. all of the mentioned
2472. Degree to which design specifications are followed in manufacturing the product is called_________________?
comments icon0

A. None of the mentioned

B. Quality Control

C. Quality Assurance

D. Quality of conformance
2473. Which of the following is not a SQA plan for a project ?
comments icon0

A. evaluations to be performed

B. audits and reviews to be performed

C. documents to be produced by the SQA group

D. amount of technical work
2474. What are legacy systems ?
comments icon0
A. old systems

B. under-developed systems

C. none of the mentioned

D. new systems

2476. National Voluntary Laboratory Accreditation Program approve accreditation in ___________________?
comments icon0
A. All of the mentioned

B. Product testing

C. Computers and electronics

D. Environmental standards

2477. Which of the following manuals is not a user documentation ?
comments icon0
A. SRS

B. Reference Guide

C. Beginners Guide

D. Installation guide

2478. In which stage of process improvement bottlenecks and weaknesses are identified ?
comments icon0

A. Process analysis

B. Process change

C. Process measurement

D. None of the mentioned

2479. Robustness answers which of the following description ?
comments icon0

A. CASE tools be used to support the process activities

B. Defined process is acceptable and usable by the engineers responsible for producing the software

C. Process continues in spite of unexpected problems

D. Process errors are avoided or trapped before they result in product errors

2480. What is a software patch ?
comments icon0

A. None of the mentioned

B. Emergency Fix

C. Daily or routine Fix

D. Required or Critical Fix

2485. Software Maintenance includes ?
comments icon0
A. All of the mentioned

B. Deletion of obsolete capabilities

C. Error corrections

D. Enhancements of capabilities

2486. Identify the correct statement with respect to Evolutionary development ?
comments icon0

A. Sometimes the construction of a throw-away prototype is not followed by a re- implementation of the software system using a more structured approach

B. It facilitates easy project management, through the high volume of documentation it generates

C. Evolutionary development usually has two flavors; exploratory development, and throw-away prototyping

D. Very large projects are usually done using evolutionary development based approach

2488. CMM stands for_____________________?
comments icon0

A. Conservative Maturity Model

B. Capability Management Module

C. Capability Maturity Module

D. Capability Maturity Model
2489. Which of the following is not included in failure costs ?
comments icon0
A. none of the mentioned

B. rework

C. repair

D. failure mode analysis

2493. Which of the following is a software process certification ?
comments icon0
A. ISO-9000

B. IBM Certified

C. Microsoft Certified

D. JAVA Certified

2494. What is not included in prevention costs ?
comments icon0

A. formal technical reviews

B. test equipment

C. equipment calibration and maintenance

D. quality planning

2495. Which standard is followed in aviation industry ?
comments icon0

A. RTRADO-178B

B. CTCADO-178B

C. RTCADO-178B

D. CTRADO-172B

2497. Which of the following manuals is a user documentation ?
comments icon0

A. SDD -Software Design Document

B. System Overview

C. None of the mentioned

D. SRS -Software Requirement Specification