1804. Lead of crossing is the distance from the_________________?
comments icon0

A. toe of the switch to the actual nose of crossing

B. heel of the switch to the theoretical nose of the crossing

C. toe of the switch to the theoretical nose of crossing

D. heel of the switch to the toe of the switch

1807. When a series of wheel loads crosses a simply supported girder, the maximum bending moment under any given wheel load occurs when________________?
comments icon0

A. the centre of gravity of the load system is midway between the centre of span and wheel load under consi-deration

B. none of the above

C. the wheel load under consideration is midway between the centre of span and the centre of gravity of the load system

D. the centre of span is midway between the centre of gravity of the load system and the wheel load under consideration
1808. Select the incorrect statement?
comments icon0

A. Start float and finish float are always equal

B. Total float can be either start float or finish float

C. Start float and finish float are the differences between activity times and not event times

D. Start float and finish float need not be equal
1809. In a scissors cross-over, the crossings provided are_________________?
comments icon0

A. 4 obtuse angle crossings

B. correct answer is ?

C. ) 4 acute angle crossings

D. 2 obtuse angle crossings

E. 6 acute angle crossings</strong>

1810. Which of the following is not a component of the shield ?
comments icon0
A. liner plate

B. propelling jacks

C. hood

D. tail

1814. When semaphore and warner are installed on the same post, then the stop indication is given when___________________?
comments icon0
A. both arms are horizontal

B. semaphore arm lowered but warner arm horizontal

C. both semaphore and warner arms lowered

D. none of the above

1815. The time corresponding to minimum total project cost is_______________?
comments icon0

A. normal time

B. between normal time and crash time

C. optimistic time

D. crash time

1816. The formation width for a railway track depends on the_________________?
comments icon0

A. ) slope of sides of embankment or cutting </strong>

B. number of tracks to be laid side by side

C. correct answer is?

D. type of gauge
1819. Batching refers to________________?
comments icon0

A. adjusting the water to be added in each batch according to the moisture content of the materials being mixed in the batch

B. controlling the quantity of each material into each batch

C. controlling the total quantity at each batch

D. weighing accurately, the quantity of each material for a job before mixing

1820. Mobilization advance up to 10% of the cost of work is given to a contractor_______________?
comments icon0
A. for all activities required to start the work at site on finalization of the contract document

B. on commencement of work at site for payment of loan taken by him

C. for the payment of advances to labour and other staff

D. for the purchase of construction materials