5702. A three hinged arch is generally hinged at its supports and__________________?
comments icon0

A. At one quarter span

B. None of these

C. At the crown

D. Anywhere in the rib
5704. Pick up the correct statement from the following?
comments icon0

A. In a loaded beam, the moment at which the entire section of the beam becomes fully plastic, is called plastic moment

B. In a fully plastic stage of the beam, the neutral axis divides the section in two sections of equal area

C. All the above

D. In a loaded beam, the moment at which the first yield occurs is called yield moment

5706. For beams of uniform strength, if depth is constant______________?
comments icon0
A. Width b M

B. Width b 3 M

C. Width b 1/M

D. Width b M

5708. For beams breadth is constant__________________?
comments icon0

A. Depth d M

B. Depth d 3

C. Depth d

D. Depth d 1/M

5713. In a shaft, the shear stress is not directly proportional to_________________?
comments icon0

A. Angle of twist

B. Length of the shaft

C. Radius of the shaft

D. Modulus of rigidity

5715. The forces acting on the bar as shown in the given figure introduce________________?
comments icon0

A. None of these

B. Compressive stress

C. Tensile stress

D. Shear stress
5716. A material may fail if______________?
comments icon0

A. /2

B. Maximum strain exceeds /E

C. 0

D. Maximum shear stress exceeds

E. All the above
5719. The maximum harbour depth below lowest low water is generally equal to_________________?
comments icon0

A. i) loaded draft + 1.2 m when bottom is soft

B. ) loaded draft + 1.8 m when bottom is soft

C. ) loaded draft + 1.8 m when bottom is rock</strong>

D. loaded draft + 1.2 m when bottom is rock
5720. Select the incorrect statement ?
comments icon0

A. In low level method of mound construction, the area of working is limited.

B. In staging method of mound cons-truction, the work is not interrupted even during stormy weather

C. The progress of work in low level method of mound construction is very slow.

D. Barge method of mound construction is economical.