civil engineering MCQs – Page 226

Practise multiple-choice questions from civil engineering for competitive examinations and subject revision. Review each marked answer and report any item that may be outdated or unclear.

civil engineering Mcqs
4503. mutually perpendicular principal stresses acting on a soil mass, the normal stress If p1 and p2 are________________?
comments icon0

A. 2

B. [(p p p p cos 2

C. [(p p p p cos 2

D. [(p p p p /2] sin 2

E. [(p p p p to the principal plane carrying the principal stress p1, is:

4505. In the zone of R.C.C. beam where shear stress is less than 5 kg/cm2, nominal reinforcement is provided at a pitch of________________?
comments icon0

A. One and half lever arm of the section

B. One -half lever arm of the section

C. Lever arm of the section

D. One-third lever arm of the section

4508. The minimum clear cover for R.C.C. columns shall be_________________?
comments icon0
A. Greater of 25 mm or diameter

B. Smaller of 25 mm or diameter

C. Smaller of 40 mm or diameter

D. Greater of 40 mm or diameter

4511. The load stress of a section can be reduced by______________?
comments icon0

A. Increasing the total perimeter of bars

B. Replacing larger bars by greater number of small bars

C. Decreasing the lever arm

D. Replacing smaller bars by greater number of greater bars

4513. To ensure uniform pressure distribution, the thickness of the foundation, is__________________?
comments icon0
A. Decreased gradually towards the edge

B. Kept uniform throughout

C. Kept zero at the edge

D. Increased gradually towards the edge

4514. Spacing of stirrups in a rectangular beam, is__________________?
comments icon0

A. Decreased towards the centre of the beam

B. Increased at the ends

C. Increased at the centre of the beam

D. Kept constant throughout the length

4516. The minimum thickness of a flat slab is taken_________________?
comments icon0

A. L/36 for end panels without drops

B. All the above

C. L/32 for end panels without drops

D. L/36 for interior panels without drop

4520. After pre-stressing process is completed, a loss of stress is due to______________?
comments icon0

A. Elastic shortening of concrete

B. Shrinkage of concrete

C. All the above

D. Creep of concrete