civil engineering MCQs – Page 100

Practise multiple-choice questions from civil engineering for competitive examinations and subject revision. Review each marked answer and report any item that may be outdated or unclear.

civil engineering Mcqs
1981. As compared to wall type breakwater, mound type breakwater_________________?
comments icon0

A. requires less material

B. requires low maintenance cost

C. requires skilled labour

D. results in less damage due to gradual failure
1982. Consider the following statements regarding provision of chases in masonry_________________?
comments icon0

A. i) Chases should be provided near to bearings of beams and lintels.</strong>

B. No chase should be permitted in a half brick load-bearing wall,

C. ect the the statements ?

D. ) Vertical chases should not be closer than 2 m in any stretch of a wall,

1986. As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken________________?
comments icon0

A. 1.35 for 20 users

B. All the above

C. 1.80 litres for 5 to 10 users

D. 1.20 litres for 15 users

1987. Pick up the excavation where measurements are made in square metres for payment ?
comments icon0

A. Ordinary cuttings up to 1 m

B. Surface dressing up to 15 cm depths

C. Surface excavation up to 30 cm depths

D. Both B. and C.
1988. The plinth area of a building not includes_________________?
comments icon0
A. Area of cantilevered porch

B. Area of the walls at the floor level

C. Internal shaft for sanitary installations up to 2 sq m. in area

D. Lift and wall including landing

1993. Which of the following factors are taken into account for estimating the runway length required for aircraft landing ?
comments icon0

A. Maximum landing weight

B. Normal maximum temperature

C. Effective runway gradient</strong>

D. ect the correct answer using the codes given below Codes?

E. Airport elevation

1995. Pick up the correct statement from the following?
comments icon0

A. If F.S.L. is above N.S.L the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth

B. If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (F.S.D.)

C. Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope

D. All the above
1996. In a cavity wall, both leaves of which are load bearing, the effective thickness is taken as________________?
comments icon0

A. sum of thickness of both leaves

B. two-third of the sum of thickness of both the leaves

C. actual thickness of the stronger leaf

D. larger of (B) and (C)
1997. The cross -sections for a highway is taken at_________________?
comments icon0

A. Intermediate points having abrupt change in gradient

B. 30 metres apart

C. All the above

D. Right angle to the centre line

1999. The effective length of a fillet weld should not be less than___________________?
comments icon0
A. four times the weld size

B. weld size

C. two times the weld size

D. six times the weld size

2000. Pick up the correct statement from the following?
comments icon0

A. The earth work in excavation to form the road embankment includes the formation of correct profile and depositing the soil in layers

B. The earthwork calculation in excavation is made from the difference in levels obtained with a level

C. All the above

D. In order to check up the average depth of excavation, Dead man s are left at the mid-widths of borrow pits