software engineering MCQs – Page 97

Practise multiple-choice questions from software engineering for competitive examinations and subject revision. Review each marked answer and report any item that may be outdated or unclear.

1923. An ongoing activity of systems support is________________?
comments icon0

A. assisting users

B. all of the above

C. recovering the system

D. adapting the system to new requirements

1924. The information of MIS comes from the________________?
comments icon0

A. Internal source

B. External source

C. Both internal and external source

D. None of the above

1928. Which of the following is(are) the step(s) in the output design process ?
comments icon0

A. identify system outputs and review logical requirements

B. all of the above

C. design, validate, and test outputs

D. specify physical output requirements

1931. Which of the following is the way to monitor the web application ?
comments icon0

A. MMC Event viewers

B. Performance logs

C. Alerts Snap-ins

D. All of the above
1932. Which of the following must be done in order to connect data from some data resource to Repeater control ?
comments icon0

A. Call the DataBind method

B. Set the DataSource property

C. Both A and B

D. None of these

1935. Which of the following is the first phase of the Systems Implementation phase ?
comments icon0

A. build and test databases

B. build and test networks

C. prepare conversion plan

D. conduct system test
1937. The deliverable of the problem analysis phase is____________________?
comments icon0

A. statement of work

B. problem statement

C. system improvement objectives

D. statement of constraints

1938. Decision trees could be represented in different ways such as________________?
comments icon0

A. Top to bottom

B. Left to right

C. All of the above

D. Bottom to top

1939. Prototypes are used in _________________?
comments icon0
A. accelerated systems analysis

B. traditional approaches

C. object-oriented analysis

D. model-driven analysis

1940. Which of the following is(are) the inputs to the Systems Construction phase ?
comments icon0
A. all of the above

B. redesigned business processes

C. physical design specifications

D. design prototypes