2701. Which of the following is the way of ensuring that the tests are actually testing code ?
comments icon0

A. Complex path testing

B. Control structure testing

C. Quality assurance of software

D. Code coverage
2703. Which of the following is not a conflict in software development team ?
comments icon0
A. Graphics issues

B. Shared and common code

C. Versions

D. Simultaneous updates

2704. Exhaustive testing is___________________?
comments icon0

A. always possible

B. impractical but possible

C. impractical and impossible

D. practically possible

2705. What is group with the responsibility for reviewing and approving changes to baselines ?
comments icon0
A. Configuration Control Board

B. Baseline

C. Software Configuration Item

D. Configuration

2706. Which of the following is not regression test case ?
comments icon0

A. A representative sample of tests that will exercise all software functions

B. Low-level components are combined into clusters that perform a specific software sub-function

C. Tests that focus on the software components that have been changed

D. Additional tests that focus on software functions that are likely to be affected by the change

2707. Behavioral testing is__________________?
comments icon0
A. Black box testing

B. Grey box testing

C. White box testing

D. None of the mentioned

2708. According to ISO 9001, inspection and testing comes under which management responsibility ?
comments icon0

A. Document control

B. Servicing

C. Control of nonconforming products

D. Process control
2709. Software Testing with real data in real environment is known as_____________________?
comments icon0

A. none of the mentioned

B. beta testing

C. regression testing

D. alpha testing

2710. Which testing tool is responsible for documenting programs ?
comments icon0

A. Test Harness System

B. Test Archiving Systems

C. Test/File Generator

D. Coverage Analyzer

2711. Which testing tool does a simple job of enforcing standards in a uniform way of many programs ?
comments icon0

A. Static Analyzer

B. Code Inspector

C. Standard Enforcer

D. Both Code Inspector & Standard Enforcer
2712. White Box techniques are also classified as_________________?
comments icon0

A. Design based testing

B. None of the mentioned

C. Structural testing

D. Error guessing technique

2713. Lower and upper limits are present in which chart ?
comments icon0
A. Run chart

B. Bar chart

C. Control chart

D. None of the mentioned

2714. Beta testing is done at_________________?
comments icon0

A. None of the mentioned

B. Users end

C. Users & Developers end

D. Developers end

2715. Which of the following is not included in Issues Meetings ?
comments icon0

A. Issues gathered the day before

B. Discussion with business

C. Attendance

D. Regular schedule of meeting

2716. Boundary value analysis belong to ?
comments icon0

A. White Box & Black Box Testing

B. None of the mentioned

C. White Box Testing

D. Black Box Testing
2719. Standard Enforcer is a___________________?
comments icon0

A. None of the mentioned

B. Static Testing Tool

C. Dynamic Testing

D. Static & Dynamic Testing

2720. What is testing process first goal ?
comments icon0
A. Bug prevention

B. Testing

C. Execution

D. Analyses

2722. Inspections and testing are what kinds of Quality Costs ?
comments icon0

A. Internal Failure

B. Prevention

C. External Failure

D. Appraisal
2723. What refers to the externally observable structure of an OO program ?
comments icon0
A. Surface structure

B. Core structure

C. All of the mentioned

D. Deep structure

2724. What is Cyclomatic complexity ?
comments icon0

A. Black box testing

B. Green box testing

C. White box testing

D. Yellow box testing

2725. Many applications using static analysis find 0.1-0.2% NCSS. NCSS stands for______________________?
comments icon0

A. Non Comment Source Sentence

B. All of the mentioned

C. Non-Code Source Statement

D. Non-Comment Source Statement
2726. Which of the following is not a change management process ?
comments icon0

A. Review impact with stakeholders

B. Log the changes

C. Estimate impact on effort and schedule

D. None of the mentioned
2727. What is a collection of software elements treated as a unit for the purposes of SCM ?
comments icon0

A. Configuration Control Board

B. Baseline

C. Configuration

D. Software Configuration Item
2728. Testing done without planning and Documentation is called_________________?
comments icon0

A. None of the mentioned

B. Unit testing

C. Adhoc testing

D. Regression testing

2729. The testing in which code is checked___________________?
comments icon0

A. Green box testing

B. Black box testing

C. Red box testing

D. White box testing
2730. Which of the following is a common pointwer problem ?
comments icon0
A. All of the mentioned

B. Attempting to use memory areas after freeing them

C. Accessing data elements of the wrong type

D. Data sharing errors

2731. Which is a black box testing technique appropriate to all levels of testing ?
comments icon0

A. Quality assurance

B. Regression testing

C. Equivalence partitioning

D. Acceptance testing

2732. Which of the following is a example of Configuration Items ?
comments icon0
A. All of the mentioned

B. SCM procedures

C. Source code

D. Software design descriptions

2734. Which of the following testing tools examine program systematically & automatically ?
comments icon0

A. Coverage Analyzer

B. Code Inspector

C. Standard Enforcer

D. Static Analyzer
2735. In which of the following testing strategies, a smallest testable unit is the encapsulated class or object ?
comments icon0

A. None of the mentioned

B. System testing

C. Integration testing

D. Unit testing
2737. Which of the following uses empirically derived formulas to predict effort as a function of LOC or FP ?
comments icon0

A. FP-Based Estimation

B. Process-Based Estimation

C. COCOMO

D. Both FP-Based Estimation and COCOMO
2738. Which of the following is a collection of project coordination technique ?
comments icon0

A. Formal approaches

B. Formal, interpersonal procedures

C. Informal, interpersonal procedures

D. All of the mentioned
2739. Who delivers the technical skills that are necessary to engineer a product or an application ?
comments icon0

A. None of the mentioned

B. Senior managers

C. Practitioners

D. Project managers

2740. Which of the following process is concerned with analyzing the costs and benefits of proposed changes ?
comments icon0

A. Version management

B. Change management

C. Release management

D. System building

2741. Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
comments icon0

A. travel and training costs

B. all of the mentioned

C. hardware and software costs

D. effort costs (the costs of paying software engineers and managers)

2745. Which of the following is incorrect activity for the configuration management of a software system ?
comments icon0

A. Version management

B. Internship management

C. Change management

D. System management

2746. Which one is not a risk management activity ?
comments icon0

A. Risk control

B. Risk generation

C. Risk assessment

D. None of the mentioned

2748. Which of the following is a people-intensive activity ?
comments icon0

A. Problem solving

B. Motivation

C. Project management

D. Organization

2750. PM-CMM stands for___________________?
comments icon0

A. product management capability maturity model

B. project management capability maturity model

C. process management capability maturity model

D. people management capability maturity model