software engineering MCQs – Page 133

Practise multiple-choice questions from software engineering for competitive examinations and subject revision. Review each marked answer and report any item that may be outdated or unclear.

2641. Which of the following is the worst type of module coupling ?
comments icon0

A. Stamp Coupling

B. External Coupling

C. Control Coupling

D. Content Coupling

2643. Which of the following is the worst type of module cohesion ?
comments icon0

A. Temporal Cohesion

B. Coincidental Cohesion

C. Logical Cohesion

D. Functional Cohesion

2644. Debugging is_________________?
comments icon0

A. creating program code

B. identifying the task to be computerized

C. finding and correcting errors in the program code

D. creating the algorithm

2645. Non-conformance to software requirements is known as___________________?
comments icon0

A. None of the mentioned

B. Software availability

C. Software failure

D. Software reliability

2646. Acceptance testing is also known as____________________?
comments icon0

A. Grey box testing

B. Alpha Testing

C. Beta testing

D. White box testing

2648. ITG stands for___________________?
comments icon0

A. individual testing group

B. independent test group

C. instantaneous test group

D. integration testing group

2649. Which testing integrates the set of classes required to respond to one input or event for the system?
comments icon0
A. thread-based testing

B. none of the mentioned

C. use-based testing

D. cluster testing

2650. Execution Verifier is a dynamic tool that is also known as_____________________?
comments icon0

A. Output Comparator

B. Coverage Analyzer

C. Test Harness System

D. Test File Generator

2651. What is validating the completeness of a product ?
comments icon0

A. Identification

B. Software

C. Auditing and Reviewing

D. Status Accounting

2652. Test cases should uncover errors like_____________________?
comments icon0

A. Comparison of different data types

B. Incorrect logical operators or precedence

C. All of the mentioned

D. Nonexistent loop termination
2653. The construction of object-oriented software begins with the creation of__________________?
comments icon0

A. design model

B. analysis model

C. code levels

D. both design and analysis model
2654. What allows different projects to use the same source files at the same time ?
comments icon0

A. Access control

B. Version Control and Access control

C. CM Process

D. Version Control
2655. Which of the following is not a part of bug report ?
comments icon0

A. Test case

B. Software Version

C. Output

D. LOC
2656. What information is required to process a change to a baseline ?
comments icon0

A. List of other items affected by the changes

B. A description of the proposed changes

C. Reasons for making the changes

D. All of the mentioned
2657. What is Six Sigma ?
comments icon0

A. The Six Sigma refers to six standard deviations

B. A Formal Technical Review(FTR) guideline for quality walkthrough or inspection

C. It is the most widely used strategy for statistical quality assurance

D. It is the most widely used strategy for statistical quality assurance AND The Six Sigma refers to six standard deviations
2658. Which of the following is a software process ?
comments icon0

A. Business modeling

B. Configuration and management

C. All of the mentioned

D. Analysis and design

2659. Which of the following is not a typical environment in communication facilitation ?
comments icon0

A. Multiple locations

B. Multiple fests

C. Multiple user groups

D. Multiple teams

2660. ________________ methods can be used to drive validations tests ?
comments icon0
A. Black-box testing

B. White-box testing

C. All of the mentioned

D. Yellow-box testing