3741. By the use of which of the following power factor can be improved?
comments icon0

A. Static capacitors

B. Phase advancers

C. Synchronous compensators

D. Any of the above
3742. Ships are generally powered by___________?
comments icon0
A. diesel engines

B. none of the above

C. hydraulic turbines

D. nuclear power plants

E. steam accumulators

3743. A synchronous condenser is virtually which of the following?
comments icon0
A. Over excited synchronous motor

B. Induction motor

C. Under excited synchronous motor

D. D.C. generator

3744. Depreciation charges are high in case of__________?
comments icon0
A. thermal plant

B. hydroelectric plant

C. diesel plant

D. none of these

3745. An over excited synchronous motor on no load is known as__________?
comments icon0

A. alternator

B. synchronous condenser

C. generator

D. induction motor

3746. In a power plant if the maximum demand on the plant is equal to the plant capacity, then
comments icon0

A. diversity factor will be unity

B. plant reserve capacity will be zero

C. load factor will be nearly 60%

D. load factor will be unity

3747. Which plant can never have 100 percent load factor?
comments icon0
A. Peak load plant

B. Nuclear power plant

C. Base load plant

D. Hydro electric plant

3748. In case of _________ fuel transportation is the major problem.
comments icon0
A. thermal power plants

B. diesel power plants

C. hydro-electric power plants

D. nuclear power plants

3749. __________ will be least affected due to charge in supply voltage frequency.
comments icon0

A. Mixer grinder

B. Room heater

C. Electric clock

D. Ceiling fan

3750. Which of the following is not an operating cost?
comments icon0

A. Fuel cost

B. Maintenance cost

C. Salaries of high officials

D. Salaries of operating staff

3751. A nuclear power plant is invariably used as a__________?
comments icon0

A. spinning reserve plant

B. peak load plant

C. stand-by plant

D. any of the above

E. base load plant
3753. The area under a load curve gives__________?
comments icon0

A. average demand

B. maximum demand

C. energy consumed

D. none of the above

3754. Which of the following power plants need the least period for installation ?
comments icon0
A. Diesel power plant

B. Hydro-electric power plant

C. Thermal power plant

D. Nuclear power plant

3756. In _________ fuel transportation cost is least.
comments icon0
A. nuclear power plants

B. None

C. steam power stations

D. diesel generating plants

3757. Different generating stations use following prime movers?
comments icon0
A. any of the above

B. diesel engine

C. gas turbine

D. steam turbine

E. hydraulic turbine

3758. Direct conversion of heat into electric power is possible through__________?
comments icon0
A. thermionic converter

B. fuel cell

C. all of the above

D. batteries

3759. For which of the following power plants highly skilled engineers are required for running the plants?
comments icon0

A. Gas turbine power plants

B. Solar power plants

C. Nuclear power plants

D. Hydro-electric power plants

3760. Annual depreciation cost is calculated by___________?
comments icon0

A. sinking fund method

B. straight line method

C. both A. and B.

D. none of the above