61. Nagpur road plan formula were prepared by assuming______________?
comments icon0

A. rectangular or block road pattern

B. radial or star and circular road pattern

C. radial or star and grid road pattern

D. radial or star and block road pattern

62. The most suitable equipment for compacting clayey soils is a_______________?
comments icon0

A. vibrator

B. sheep foot roller

C. pneumatic tyred roller

D. smooth wheeled roller

65. In hill roads the side drains arc provided________________?
comments icon0
A. only on the hill side of road

B. only on the opposite side of hill

C. on both sides of road

D. none of the above

66. Tyre pressure influences the______________?
comments icon0

A. total depth of pavement

B. quality of surface course

C. both the above

D. none of the above

67. The fundamental factor in the selection of pavement type is_____________?
comments icon0

A. climatic condition

B. type and intensity of traffic

C. subgrade soil and drainage conditions

D. availability of funds for the construction project

69. Bitumen of grade 80/100 means______________?
comments icon0
A. its penetration value is 8 to 10 mm

B. its penetration value is 10 mm

C. its penetration value is 8 mm

D. its penetration value is 8 to 10 cm

70. Which of the following is indicated by a warning sign ?
comments icon0

A. overtaking prohibited

B. end of speed limit

C. level crossing

D. no parking

71. When the speed of traffic flow becomes zero,then_______________?
comments icon0
A. traffic density attains maximum value whereas traffic volume becomes zero

B. traffic density and traffic volume both attain maximum value

C. traffic density and traffic volume both become zero

D. traffic density becomes zero whereas traffic volume attains maximum value

73. The thickness of bituminous carpet varies from__________________?
comments icon0
A. 20 to 25 mm

B. 50 to 75 mm

C. 100 to 120 mm

D. 75 to 100 mm

74. In highway construction, rolling starts from________________?
comments icon0
A. sides and proceed to centre

B. any of the above

C. centre and proceed to sides

D. one side and proceed to other side

75. The maximum number of vehicles beyond which the rotary may not function efficiently is______________?
comments icon0

A. 500 vehicles per hour

B. 500 vehicles per day

C. 5000 vehicles per hour

D. 5000 vehicles per day

76. The terrain may be classified as rolling terrain if the cross slope of land is______________?
comments icon0

A. between 25% and 60%

B. between 10% and 25%

C. upto 10%

D. more than 60%

77. Maximum number of vehicles can be parked with_______________?
comments icon0
A. 90 angle parking

B. 45 angle parking

C. 30 angle parking

D. parallel parking

78. In CBR test the value of CBR is calculated at_______________?
comments icon0

A. 2.5 mm penetration only

B. 5.0 mm penetration only

C. 7.5 mm penetration only

D. both 2.5mm and 5.0 mm penetrations
79. Tie bars in cement concrete pavements are at______________?
comments icon0
A. longitudinal joints

B. warping joints

C. expansion joints

D. contraction joints