dock and harbor engineering MCQs – Page 2

Practise focused dock and harbor engineering questions with marked answers for exam preparation and subject revision.

dock and harbor engineering Mcqs
21. If H is the height of the wave expected, then the height of the breakwater is generally taken as______________________?
comments icon0

A. 1.2 H to 1.25 H above the low water level

B. 1.2 H to 1.25 H above the mean sea level

C. 1.2 H to 1.25 H above the high water level

D. 1.2 H to 1.25 H above the datum

22. In a two lane channel, bottom width of channel is given by_______________?
comments icon0
A. 2 x Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane

B. Manoeuvring lane + 2 x Bank clearance lane

C. Manoeuvring lane + 2 x Bank clearance lane + ship clearance lane

D. 2 x Manoeuvring lane + 2 x Bank clearance lane

23. Consider the following statements?
comments icon0

A. ) Slip is the space of water area between two adjacent piers where ships are berthed,

B. ect the correct statements?

C. ="color: #003f1a;">(i) Fender is the cushion provided on the face of the jetty for ships to come in contact,

D. i) Pier head is a structure constructed near the tip of a break water near the harbour entrance.</strong></span>

24. Which of the following structures are constructed parallel to shore line to develop a demarcating line between land area and water area ?
comments icon0

A. sea walls, bulk heads and groynes

B. bulk heads, revetments and groynes

C. sea walls, bulk heads and revetments

D. sea walls, revetments and groynes

26. Which of the following type of sea walls results in greatest protection of shore structures?
comments icon0

A. stepped sea wall

B. vertical sea wall

C. sea wall with concave face

D. sea wall with batter

30. The significant wave height is defined is the average height of the_________________?
comments icon0

A. one fourth highest waves

B. one third highest waves

C. one tenth highest waves

D. one fifth highest waves

32. As compared to wall type breakwater, mound type breakwater_________________?
comments icon0

A. requires less material

B. requires low maintenance cost

C. results in less damage due to gradual failure

D. requires skilled labour