requirement engineering MCQs – Page 4

Practise focused requirement engineering questions with marked answers for exam preparation and subject revision.

requirement engineering Mcqs
61. What is the major drawback of CORE ?
comments icon0
A. Role of analyst is passive

B. All of the mentioned

C. Requirements are comprehensive

D. NFRs are not given enough importance

64. Requirements analysis is critical to the success of a development project ?
comments icon0

A. FALSE

B. Depends upon the size of project

C. None of the mentioned

D. True
65. Which of the following is not included in SRS ?
comments icon0

A. Performance

B. Design solutions

C. Functionality

D. External Interfaces

67. Which two requirements are given priority during Requirement Management of a product ?
comments icon0

A. User and Developer

B. All of the mentioned

C. Functional and Non-functional

D. Enduring and Volatile
68. Which of the following is not a diagram studied in Requirement Analysis ?
comments icon0
A. Activity Diagram

B. Use Cases

C. State Transition Diagram

D. Entity Relationship Diagram

70. Arrange the steps in order to represent the conducting of Wide band Delphi Technique ?
comments icon0

A. . Present experts with a problem

B. Conduct another group discussion

C. Collect expert opinion anonymously

D. Feedback a summary of result to each expert</strong>

E. Conduct a group discussion

F. Iterate until consensus is reached

74. Which one of the following is not a step of requirement engineering ?
comments icon0

A. analysis

B. design

C. documentation

D. elicitation

75. Select the developer-specific requirement ?
comments icon0

A. Portability

B. Maintainability

C. Availability

D. Both Portability and Maintainability
76. Why is Requirements Management Important ? It is due to the changes___________________?
comments icon0

A. in customers expectations

B. to the environment

C. in technology

D. in all of the mentioned.
78. Which of the following Requirement Elicitation Techniques is applicable to messy, changing and ill-defined problem situations ?
comments icon0

A. Controlled Requirements Expression (CORE)

B. Quality Function Deployment (QFD)

C. Soft Systems Methodology (SSM)

D. Prototyping

80. According to components of FURPS+, which of the following does not belong to S ?
comments icon0

A. Testability

B. Speed Efficiency

C. Installability

D. Serviceability