tunnel engineering MCQs – Page 2

Practise focused tunnel engineering questions with marked answers for exam preparation and subject revision.

tunnel engineering Mcqs
21. American method of tunneling________________?
comments icon0

A. ect the correct answer?

B. ) requires heavy timbers </strong>

C. is no, suitable for railway or highway tunnels

D. is suitable for large sized tunnels
24. Which one of the following tunnelling methods is used for laying under ground sewers ?
comments icon0

A. Needle beam method

B. Army method

C. German method

D. Italian method

25. Drifters can be used to drill_________________?
comments icon0

A. only up holes

B. horizontal or up holes

C. horizoral, down or up holes

D. only down holes

26. What is the correct sequence of the following events of construction of a shaft in rock ?
comments icon0
A. drilling and blasting

B. mucking</strong>

C. timbering

D. pumping

27. In compressed air tunneling, the volume of free air provided is______________?
comments icon0

A. 20 m3 per minute per m2 of face area

B. 6 m3 per minute per m2 of face area

C. 6 mJ per second per m2 of face area

D. 6 m3 per hour per m2 of face area