estimating and costing MCQs – Page 4

Practise focused estimating and costing questions with marked answers for exam preparation and subject revision.

estimating and costing Mcqs
62. The item of steel work which is measured in sq.m, is_________________?
comments icon0

A. Collapsible gates

B. Rolling shutters

C. All the above

D. Ventilators and glazing

63. Pick up the correct statement from the following?
comments icon0

A. The formal acceptance by the administrative department for incurring an expenditure on the work, is called administrative approval

B. The actual expenditure involved to complete a work including incidental, establishment and travelling charges, is called actual cost

C. All the above

D. The estimated value of the work excluding the amount for contingencies, work charged establishment, tool and plants, is called work value

64. Pick up the incorrect statement regarding a master trap from the following ?
comments icon0

A. It is provided a cleaning eye at the top of the trap

B. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe

C. It is provided in between the lower end of the house drain and the street sewer

D. The water seal is less than that of ordinary traps
66. The brick work is measured in sq metre, in case of_________________?
comments icon0
A. All the above

B. Honey comb brick work

C. Brick flat soling

D. Half brick walls or the partition

67. period in a septic tank is assumed___________________?
comments icon0
A. 30 minutes

B. 40 minutes

C. 20 minutes

D. 25 minutes

E. detention

68. The order of booking dimensions is________________?
comments icon0

A. None of these

B. Length, breadth, height

C. Height, breadth, length

D. Breadth, length, height

72. Pick up the incorrect statement from the following?
comments icon0

A. The usable covered area of the rooms of any storey of a building is called carpet area

B. The carpet area of a building along with area of its kitchen, pantry, store, lavatory, bath room and glazed veranda, is called floor area

C. The built up covered area at the floor level of any storey of a building is called plinth area

D. None of these
74. Referring of given figure, pick up the correct statement from the following?
comments icon0

A. Length of long wall out-to -out is 6.80 m

B. The total length of centre line of four walls is 20 m

C. All the above

D. Length of short walls in-to-in is 3.20 m

75. Pick up the correct statement from the following?
comments icon0

A. If the bed level is above N.S.L. the canal is called fully in baking and the berms are designed as 3 d where d is full supply depth of water (F.S.D.)

B. If F.S.L. is above N.S.L the canal is called partly in cutting and partly in filling and berms are designed as 2d where d is full supply depth

C. All the above

D. Area of canal in cutting = BD + Sd2 where B = bed width, d = depth of cutting and S is the side slope

76. Size, capacity and materials need be specified for__________________?
comments icon0

A. Ball valves

B. Bib-cocks

C. All the above

D. Stop-cocks

77. Pick up the incorrect statement from the following ?
comments icon0

A. No deduction is made for volumes occupied by pipes, not exceeding 100 sq.cm in cross-section

B. None of these

C. No deduction is made for the volume occupied by reinforcement

D. No deduction is made for the openings upto 0.1 sq.m

79. Pick up the correct statement from the following?
comments icon0

A. All pipes and fittings are classified according to their diameters

B. The diameter of the pipes is the nominal diameter of internal bore

C. All the above

D. All pipes are measured along the centre line of the pipes in metres

80. Pick up the correct statement in case of water supply ?
comments icon0

A. Pipes laid in trenches and pipes fixed to walls are measured separately

B. All the above

C. Pipes are classified according to their sizes and quality

D. Cutting through walls and floors are included with the item