water management MCQs – Page 8

Practise focused water management questions with marked answers for exam preparation and subject revision.

water management Mcqs
141. A mine or tunnel for collecting seepage water in rock or dam is called ____________________?
comments icon0

A. Water tunnel

B. Seepage tunnel

C. Seepage Drain

D. Seepage gallery
145. The maximum rate at which the soil in given condition can absorb water is called ___________________?
comments icon0

A. Field Capacity

B. Infiltration capacity

C. Capillarity

D. All are correct

147. According to Chezys formula, the discharge through an open channel is equal to _________________?
comments icon0
A. Ac?R.S

B. A (c.A/pi) <sup>1/2 </sup>

C. C (mi) <sup>1/2 </sup>

D. A (cmi)<sup>1/2 </sup>

148. Total energy line (T.E.L) represents the sum of ________________________?
comments icon0

A. Velocity head + potential head + datum head

B. Pressure head + kinetic head and datum head

C. Velocity head + kinetic head + datum head

D. The energy head + potential head + datum head

151. The difference between saturation vapour pressure and actual vapour pressure at a constant temperature is called ___________________?
comments icon0

A. Saturation vapour pressure

B. Partial pressure

C. Actual vapour pressure

D. Saturation deficit