waste water engineering Mcqs
1. Pick up the correct statement from the following?
comments icon0
A. All the above

B. 4 ppm of Dissolved Oxygen (D.O.) is ensured before discharging the treated sewage in river

C. Hydrogen sulphide gas in excess, may cause corrosion of concrete sewers

D. Solubility of oxygen in sewage is 95% of that of distilled water

2. Dry weather flow is__________________?
comments icon0

A. Average daily rate of flow

B. Water supply allowance per capita

C. Average monthly rate of flow

D. Average annual rate of flow

3. Which of the following pumps in used to pump sewage solids with liquid sewage without clogging the pump is ?
comments icon0

A. None of these

B. Centrifugal pump

C. Pneumatic ejector

D. Reciprocating pump

5. The pressure exerted by_____________?
comments icon0

A. Pressure sewers are designed to be safe in tension

B. All the above

C. The internal pressure if any, causes tensile stress in the pipe material

D. The sewage when running full from inside, is called internal pressure

7. Hydraulic mean radius is_______________?
comments icon0

A. Mean of radii in a pipe line of varying cross -sections

B. Mean radius of sewer

C. Difference in heads between two points in circular pipes

D. Cross-sectional area/wetted perimeter
8. The asbestos cement sewers are_________________?
comments icon0

A. Susceptible to corrosion by sulphuric acid

B. Not structurally strong to bear large compressive stress

C. Light in weight

D. All the above
9. For a continuous flow type of sedimentation tanks__________________?
comments icon0

A. Length of the tank is normally kept 4 to 5 times the width

B. Width of the tank is normally kept about 6 m

C. Maximum horizontal flow velocity is limited to 0.3 m/minute

D. All the above
10. For treating the sewage of a large city, you will recommend_________________?
comments icon0

A. Sedimentation tanks with high rate trickling filters

B. A plant consisting of Imhoff tanks with low rate trickling filters

C. None of these

D. A sedimentation tank and an activated sludge treatment plant
11. The sewer which received discharge from two or more main sewers, is known as_______________?
comments icon0
A. A trunk sewer

B. A main sewer

C. An intercepting sewer

D. An outfall sewer

13. R.M.O. expenses include___________________?
comments icon0

A. Running expenses

B. Maintenance expenses

C. All the above

D. Operation expenses

14. No treatment of the sewage is given if dilution factor is_____________?
comments icon0
A. More than 500

B. Less than 150

C. Between 200 to 300

D. Between 150 to 200

15. th or th extra space is left in sewer pipes at maximum discharge for_________________?
comments icon0

A. Unexpected increase in population

B. Low estimates of the average and maximum flows

C. Large scale infiltration of storm water

D. All the above
17. The rainfall at any place may be determined by__________________?
comments icon0

A. Its intensity

B. All the above

C. Its direction

D. Its frequency

18. The coagulant which is generally not used for treating the sewage, is__________________?
comments icon0

A. Ferric chloride

B. Ferric sulphate

C. Chlorinated copperas

D. Alum